| 1. | Construction completion date civil works 工程完成日期土木工程 |
| 2. | Construction completion date 工程竣工日期: |
| 3. | Construction completion date 工程完成日期 |
| 4. | Regulation of technical document for construction completion of petrochemical industry project 石油化工工程建设交工技术文件规定 |
| 5. | Optimum level of construction completion on global optimization is not only the evaluating indicator but the critical factor in construction control 经过全局优化的最优施工完成度不单是一个评价指标,而且是施工控制中的关键因素;采用全局优化思想对施工过程中的立模标高进行控制。 |
| 6. | Level of construction completion based on the construction control program are used to guide construction , this will be optimum construction state and optimum completion state of long span continuous rigid frame bridges 结论利用提出的基于最优施工完成度的施工控制方案来指导施工,会使连续刚构桥的施工由最优节段施工状态最终达到最优成桥状态。 |
| 7. | When the district lands officer has received the construction completion report , and is satisfied that all other obligations imposed under the leaselicence conditions have been complied with , he will issue a certificate of compliance 地政专员在收到兴建完成报告,并信纳申请人已完全履行土地契约建屋牌照规定的所有其他责任后,便会签发完工证。 |
| 8. | The control of the engineering costs in college capital construction projects depends largely on the control and supervision of such factors as decision - making , bidding at design stage , supervising at construction stage and settlement after the construction completion 摘要高校基建工程控制造价,要做好决策、设计阶段工程招投标、施工过程管理、工程竣工结算等几个重要环节的控制和管理。 |
| 9. | On completion of building works , the t2 competent person as recognised by the buildings department , and the registered structural engineerregistered professional engineer employed by the applicant shall jointly certify and submit to the district lands officer a construction completion report 建筑工程完成后,申请人所聘用符合屋宇署认可的t2合资格人士,及注册结构工程师注册专业工程师须向地政专员提交一份联合签署的兴建完成报告。 |
| 10. | This paper proposes optimum level of completion of construction stage and optimum level of construction completion of state of accomplished bridge of long span continuous rigid frame bridges , proposes optimum completion state and optimum construction stage of long span continuous rigid frame bridges , level of construction completion are used to evaluate approach degree between construction and design 方法提出大跨度连续刚构桥的最优节段施工完成度、最优成桥施工完成度、最优节段施工状态和最优成桥施工状态的概念,并利用施工完成度来评价桥梁施工过程与成桥状态对设计和规范的满足程度。 |